Extension cost calculator: how to work out your build cost per square metre
5 min
7
September 2026. Costs are indicative 2026 UK ranges, not a quotation.
Key figures in this guide
One-minute decision
What are you trying to work out?
Use the guide to decide the role, then search for the right type of professional rather than asking everyone for the same thing.
Find professionalsInteractive · 2026 rates
Work out your own build cost
Single-storey rear extension, indicative 2026 rates.
| Activity | Quantity | Unit | Rate (£) | Cost | Remove |
|---|---|---|---|---|---|
| £13,000 | |||||
| £22,500 | |||||
| £9,500 | |||||
| £9,600 | |||||
| £6,500 | |||||
| £5,500 | |||||
| £4,500 | |||||
| £7,500 |
Rates are indicative UK averages for 2026. Change any figure to match quotes you have received.
- Works subtotal
- £78,600
- Contingency (10%)
- £7,860
- VAT (20%)
- £17,292
- Total estimated cost
- £103,752
The average extension cost in the UK is £2,100 - £5,600 per square metre in 2026, depending on region and finish. A typical 20 square metre mid-finish rear extension is about £48,000 - £74,000 for the shell, plus 10 to 15 per cent in professional fees, plus kitchen, glazing and contingency.
There is no single cost per square metre for an extension, but there is a reliable way to calculate your own number. This guide gives you the method, the current UK ranges and the additions people forget.
2026 BUILD RATES PER SQUARE METRE
| Region | Basic finish | Mid finish | High finish |
|---|---|---|---|
| London | £3,000 - £3,600 | £3,400 - £4,200 | £4,200 - £5,600 |
| South East | £2,700 - £3,200 | £3,000 - £3,700 | £3,700 - £4,900 |
| Midlands and South West | £2,300 - £2,800 | £2,600 - £3,200 | £3,200 - £4,200 |
| North and Scotland | £2,100 - £2,600 | £2,400 - £3,000 | £3,000 - £3,900 |
Worked example, 2026: a 20 square metre mid-finish rear extension in the Midlands at £2,900 per square metre is £58,000 for the shell, plus around £8,000 in fees and a £7,000 contingency, so plan for £73,000 before the kitchen.
The calculation
- 01Measure the new internal floor area in square metres.
- 02Multiply by a build cost rate per square metre for your quality level and region.
- 03Add works outside the extension footprint: knock-throughs, remedial work, redecoration to existing rooms, landscaping and making good.
- 04Add kitchens, bathrooms, joinery, flooring and specialist glazing separately. These are not in a shell rate.
- 05Add professional fees and statutory costs, typically 10 to 15 per cent of build cost.
- 06Add VAT at 20 per cent if your rates were quoted excluding VAT. Most contractors registered for VAT will charge it on domestic extensions.
- 07Add contingency: 10 per cent on a new-build extension, 15 to 20 per cent where you are opening up an older house.
Indicative UK build cost rates
These are shell-and-core to finished-but-basic rates, excluding VAT, kitchens and furniture.
- Standard specification, outside London and the South East: roughly 1,800 to 2,400 pounds per square metre.
- Mid specification, most of England and Wales: roughly 2,400 to 3,000 pounds per square metre.
- High specification, or London and the South East: roughly 3,000 to 4,000 pounds per square metre.
- Premium and heavily glazed schemes: 4,000 pounds per square metre and upwards.
Basements and structural underpinning sit outside these ranges and cost multiples more. Loft conversions are usually cheaper per square metre than ground floor extensions, because the shell already exists.
A worked example
A 30 square metre single-storey rear extension, mid specification, outside London.
- Shell: 30 x 2,600 = 78,000
- Structural opening into the existing house, plus making good: 9,000
- Kitchen supply and fit: 18,000
- Flooring, decoration and lighting: 8,000
- Sliding doors and rooflights uplift above allowance: 7,000
- Subtotal: 120,000
- Fees, surveys and statutory costs at 12 per cent: 14,400
- Contingency at 12 per cent: 14,400
- Total excluding VAT: 148,800
- Total including VAT at 20 per cent: 178,560
The headline "30 metres at 2,600" number was 78,000. The realistic commitment is more than double. That gap is where most extension projects go wrong.
Costs people leave out
- Design and engineering fees, and planning or lawful development application fees.
- Building control fees and inspections.
- Party wall surveyor fees, often 1,000 to 2,500 pounds per neighbour if you appoint separate surveyors.
- Site surveys: measured survey, drainage CCTV, asbestos, tree survey where relevant.
- Utility diversions, new consumer unit, boiler upgrade or heating redesign.
- Scaffolding, skips, welfare and temporary protection.
- Build over agreement with the water company where you build near a public sewer.
- Living costs if you move out, or the productivity cost if you do not.
What moves the number most
- 01Ground conditions and foundation depth, particularly near trees or on clay.
- 02The size of structural openings. A 6m clear opening is a very different steel from a 3m one.
- 03Glazing. Large sliding or pivot doors and structural glass are a specification decision with a five-figure swing.
- 04Access. A rear garden reachable only through the house adds labour and protection cost to every delivery.
- 05Roof form. Flat roof with rooflights is cheaper than a pitched roof with a lantern and complicated junctions.
- 06Whether you are also touching services, plumbing and electrics in the existing house.
How to get from estimate to real price
An estimate is only a budget test. To get a comparable price, you need a specification and drawings that every contractor prices identically, then compare on scope, exclusions, provisional sums, programme and payment terms rather than the bottom line.
What to do next
- 01Set your total budget, then work backwards to an affordable area rather than picking a size first.
- 02Ring-fence contingency and keep it out of the design conversation.
- 03Get a designer to produce a specification good enough to price.
- 04Send an identical brief to three or four contractors.
- 05Compare like for like and check what each price excludes.
Renovome Workspace turns this into a live budget and programme, and matches you with professionals near you who work at your quality level.
Last reviewed: September 2026. Costs are indicative 2026 UK ranges, not a quotation.